Safety instructions for ACME filling valve, external filling valve incl. installation pot on angled filling hose
1. ensure that the ACME filling valve is properly installed and that all connections are secure and tight.
2. before using the filling valve, check the condition of the filling hose and ensure that it is not cracked, damaged or leaking.
3. when connecting the filling valve to the external tank, follow the instructions provided by the manufacturer and adhere to the recommended connection methods.
4. avoid any contact with flammable liquids or vapours when operating the filling valve.
5. keep the filling valve and filling hose away from heat sources.
6. use the ACME filling valve only for its intended purpose and do not exceed the maximum permissible load.
7. observe all applicable safety regulations and requirements when handling the ACME filling valve.
8. regularly check the condition of the ACME filling valve and, if necessary, carry out maintenance or repair work in accordance with the manufacturer's instructions.
9. in the event of problems, damage or leaks in the filling valve, contact the manufacturer or an authorised specialist for inspection and repair.